// FIELD SERVICE MANAGEMENT · AV INTEGRATION · IRELAND

MFIT — Field Service Management Platform

One platform connecting engineers, warehouse, clients, and accounting — with AI built in throughout

Built for AV integration and installation companies, MFIT replaces spreadsheets, WhatsApp chains, and disconnected tools with a single system that manages every job from creation to invoice — with real-time visibility across every role.

// THE CHALLENGE

Running a national AV installation business on spreadsheets and group chats was no longer sustainable

Spreadsheet & WhatsApp Chaos

100+ jobs/monthNo centralized system
  • ×Jobs tracked across scattered spreadsheets
  • ×Engineer updates via WhatsApp messages
  • ×No real-time visibility into job status
  • ×Scheduling conflicts and missed assignments

No Field Accountability

Zero photo proofManual status updates only
  • ×Engineers had no structured completion workflow
  • ×No timestamped photos from installations
  • ×Client disputes with no documented evidence
  • ×Failed installs not properly tracked or reported

Warehouse & Stock Blind Spots

Multi-warehouseNo inventory visibility
  • ×Stock levels unknown until physically counted
  • ×No tracking of equipment allocated to jobs
  • ×Engineer vans had unrecorded inventory
  • ×Pick lists created manually before each job

Slow Manual Invoicing

Delayed billing cyclesNo accounting automation
  • ×Invoices built manually from job records
  • ×Travel costs calculated per county by hand
  • ×No integration between job completion and billing
  • ×CSV exports required for every external system

// THE PLATFORM

Six integrated modules that connect every part of AV installation operations

Scheduling & Dispatch

  • ✓Interactive Ireland map with color-coded job markers
  • ✓Gantt calendar with drag-and-drop rescheduling
  • ✓AI schedule assistant for route optimization
  • ✓Engineer county assignments and availability tracking

Job Management

  • ✓Full job lifecycle from creation to invoice
  • ✓Bulk CSV import with AI-powered column mapping
  • ✓Eircode geocoding for automatic map placement
  • ✓Full audit trail of every change made to a job

Engineer Mobile Experience

  • ✓Today's jobs card with at-a-glance schedule
  • ✓Photo upload and speech-to-text note entry
  • ✓Mark jobs complete with status, photos, and notes
  • ✓Nearby unassigned jobs with distance calculations

Client Portal

  • ✓Submit installation requests directly
  • ✓Real-time visibility into job progress
  • ✓View completed jobs with photos and notes
  • ✓Stock visibility for allocated and reserved items

Warehouse & Stock

  • ✓Multi-warehouse inventory tracking
  • ✓Auto-generated daily pick list for scheduled jobs
  • ✓Stock prep orders and stocktake with variance tracking
  • ✓AI Stock Chat for natural language inventory queries

Accounting & Invoicing

  • ✓Professional invoices with line items and pricing
  • ✓County-based travel rate configuration
  • ✓AI-powered invoice line item summarization
  • ✓CSV export for external accounting systems
MFIT Jobs Map and Gantt Calendar
MFIT AI Job Scheduling

// PLATFORM SCALE

Built to handle the full complexity of national AV installation operations

10

User Roles

From engineer to accountant — every stakeholder has a tailored dashboard

6

Integrated Modules

Scheduling, jobs, mobile, client portal, warehouse, and accounting in one system

100%

Real-Time Visibility

Every job, engineer location, and stock movement visible live across all roles

MFIT AI Stock Chat and Stock Reports

// TECHNICAL ARCHITECTURE

10 user roles, real-time sync, and 5 third-party integrations

10 Role-Based Access Levels

Super AdminAdminAccountingEngineerMaintenance EngineerWarehouse ManagerWarehouse Check-InClient AdminClientTV Display

Real-Time Updates

Live data synchronization across all users and roles simultaneously

Offline-Friendly Mobile

Designed for engineers working in areas with limited connectivity

PDF Generation

Generate job sheets, invoices, stock reports, and manuals as PDFs

Bulk Operations

Import, export, and batch-process hundreds of records at once

Role-Based Security

Row-level security ensuring users only see data they're authorized to access

Map Pop-Out

Detach the live dispatch map to a second monitor for office setups

Third-Party Integrations

Frotcom

Real-time vehicle GPS tracking on map

Gmail

Email sync with AI summarization

Slack

Automated alerts for new jobs and urgent issues

Zoho Desk / Heartbeat

Bi-directional support ticket management

ElevenLabs

Text-to-speech for accessibility features

// WHAT WE DELIVERED

One platform that replaced every disconnected tool in the operation

Spreadsheets Replaced

Every job, engineer assignment, and status update lives in one system — no more scattered spreadsheets or WhatsApp chains

Field Accountability Built In

Engineers complete jobs with photos, notes, and geolocation — every installation is documented with a full audit trail

Warehouse Fully Visible

Real-time stock across multiple warehouses, engineer vans, and jobs — with AI chat for instant inventory queries

Invoicing Automated

Jobs flow directly into invoices with county travel rates, line items, and one-click PDF generation

AI Throughout

Route optimization, CSV column mapping, callout pattern analysis, stock chat, and invoice summarization — AI built into every workflow

Every Stakeholder Connected

10 role-based dashboards ensure engineers, admins, clients, warehouse teams, and accountants all work from the same data

User Roles10
PlatformIreland-Focused
Integrations5 External
MobileOffline-Friendly
AIBuilt Throughout
ExportPDF + CSV

// BUILD SOMETHING LIKE THIS

Want a Platform Built for Your Operation?

MFIT is a production-grade platform built by IntelOps Technology. If you have a complex operations challenge that needs AI integration, real-time data, and a system built around your workflows — let's talk.

10

User Roles

AI

Built Throughout

100%

Custom Built